Monday, December 21, 2009

TR Cutler Looks at e-Kanban Leader Ultriva and TRANE for Manufacturing Alumni

it's mimicked analogously in that all functions are accepted to be the angular leaders of our initiative. From a college akin of Ingersoll-Rand -- even our CEO participates in 2 kaizen contest a year at altered plants, so it's acceptable allotment of our ability for sure,” acclaimed John Young, Materials/Supply Chain Leader of TRANE Residential Systems – Vidalia, GA.

TRANE acclimated differing types kanban's with desultory success above the sites in TRANE Residential. There was no acclimation and in a lot of cases the kanban's would not run correctly. Lost cards, no way to re-size efficiently, no afterimage for kanban's in action with suppliers, were all challenges.

TRANE came to attending at Ultriva as a band-aid because the alignment capital to apparatus kanban's and Young acquainted that based on accomplished experiences, “I capital some technology enablers to acquiesce us administration accoutrement as well. Also, we came above Ultriva as band-aid due to a Six Sigma Project Team I was allowance advance on actual planning improvements.”

Conditions bare Improvement
Stock outs, too abundant material, no afterimage to locations with suppliers, and no afterimage to locations in transit. There was no adeptness to admeasurement OTD with suppliers; no adeptness to accept absolute time receipts. Young acclaimed that TRANE Residential, “Needed poka yoke's on accepting action and Material Control needs. We bare acceptance to the abstracts to abode increases and decreases in appeal for Kanban's and there had to be a Supplier Portal to accept afterimage into our boutique floor. All this was bare alternating with the adeptness to run MRP orders the aforementioned as kanban, but just as ancient orders.”

TRANE Resident looked at several cyberbanking kanban programs, including a home accounting one that already existed for centralized bogus locations in the Tyler facility. “In the FMEA of our six sigma activity on actual planning improvements, Ultriva was able to move about all of our accomplished baronial issues to non-issues through poka yoke's or basal issues through its above methodology,” appropriate Young.

Specific Benefits of Consumption-based Replenishment:

$4.7 Million in Material accumulation through acknowledged accomplishing as allotment of ascendancy plan the companies Six Sigma project.
$243k accumulation in 90 canicule (pilot period).
Increased turns from low individual digits to 25+ on clue to hit 33 by year end (measured as COGS).
Stock outs with no afterimage as to why are gone.
When there is a banal out now, the aggregation knew it was advancing and is assertive as to basis could cause in account of abstracts analysis.
OTD metrics for suppliers are now available, none existed previously
Transit advance time metrics (impossible in added systems).

Expanding the Electronic Kanban:
The arrangement is accepting activated with the absolute accumulation chain, accepting implemented above the TRANE Residential division. The Ultriva arrangement is implemented on over 85% of Vidalia's absorb now. All sites are accepted to be on it aural 18 months, absolutely 100% (in TRANE RS Division).

Lean Technology Providing a Competitive Advantage

According to Young, “This Ultriva arrangement provides a aggressive advantage in that we are able to see down to actual diminutive levels of details, what's accident in our accumulation chain. This appraisal apparatus allows a administrator to absolutely aught in on basis could cause and abolish affections from appraisal and drive abstracts apprenticed accommodation making. Being able to accept abounding afterimage into our accumulation alternation allows us to acknowledge to abrupt affairs better, acknowledge to appeal shifts, abbreviate appulse to our banking stakeholders as able-bodied as accord astute expectations to centralized and alien customers.”

Ultriva (www.Ultriva.com) is abide at over 120 plants above 10 countries. Companies like Emerson, BE Aerospace, Trane, Ingersoll-Rand, McKesson, AO Smith, FRANKE and AGCO a allotment of others are application Ultriva to coact with over 4000 suppliers and transacting $1.5 billion of purchased locations every year.

The complete article may be apprehend at http://manufacturing.wtgalumni.com/media_detail.php?id=594.

Ultriva
www.ultriva.com
Cindy McGowan
pr@ultriva.com
408.248.9803

No comments:

Post a Comment